FinestSupplierAdsorbents, desiccants, catalyst media, specialty chemicals, and process filtration media for technical procurement teams.
SS304 316 Stainless Steel Panel Food Grade Sectional Water Storage Tank for Drinking Water
Drinking Water

SS304 316 Stainless Steel Panel Food Grade Sectio | RFQ Sourcing Details

Drinking Water · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryVOC Adsorbents
Unitset
materialstainless steel sheet SS304, SS316 Panel
specificationRaw
CategoryDrinking Water
CategoryDrinking Water
AvailabilityInquiry required
Updated2026-05-27

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Drinking Water. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

SS304 316 Stainless Steel Panel Food Grade Sectional Water Storage Tank for Drinking Water Stainless steel water tank is made from stainless steel 304 and 316,which is high quality steel in the world.So the stainless water tank is hygienic and durable.

It is non-harmful and can be easily assembled by bolting them together. The tank can be assembled precisely according to requirements due to the range of panels available with varying strength, thickness and dimensions.The panel are designed to meet the highest standards of sanitary storage of potable water.

Stainless steel water tank specification Raw material stainless steel sheet SS304, SS316 Panel size 500*500mm,1000*500mm,1000*1000mm, 1500*1500mm Panel thickness 1.0mm,1.2mm,1.5mm, 2mm, 2.5mm, 3mm, 4mm Process technique Ramming craft Accessories Tiepiece, support, flange/socket, ladder, angle iron, water gauge,welding stick Foundation Concrete foundation and U-steel bottom base Connection type Argon arc welding Life time more than 10 years Drawing Show 1.

Potable Water Storage Tanks 2. Fire Reserve Storage Tanks, Swimming Pool Balance Tanks 3. Boiler system of the supplementary water tank, heat preservation water tank. 4. Septic Tanks and Sewage Tanks 5. Rain Water Harvesting Tanks, Well Water Tanks, Sea Water Tanks 6.

Reverse-Osmosis Water Tanks (water with high or low conductivity) 7. Distillation and Process Tanks 8. Industrial Process Tanks, Chiller Water Tanks, Cooling Tower Water Tanks 9. Hot Water Storage Tanks and Chemical Substance Storage Tanks 10. Agricultural Irrigation Tanks. Installation reference: Step 1.

Install steel footings on leveled concrete foundations. Step 2. Stainless steel panels to be pre assembled. Step 3. Place rubber sealant from ready-to-use roll between panels. Step 4. Connect panels with bolts and nuts. Step 5. Position bottom panel sections, and finish up base of tank. Step 6.

Position three sides of the tank. Step 7. Position and fix roof panels and if required, roof support pipes and plates. Step 8. Install reinforcement if required. Step 9. Close up the tank with the fourth side. Step 10. Finish the internal or external reinforcement. Step 11. Fill and test.

SS304 | Applications and Buyer Notes

SS304 is organized as a sourcing-ready Drinking Water reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time questions be

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Drinking WaterBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
material
stainless steel sheet SS304, SS316 PanelBased on visible page data; confirm exact value in the RFQ.
specification
RawBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryVOC Adsorbents
Unitset
materialstainless steel sheet SS304, SS316 Panel
specificationRaw

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

FinestSupplier related sourcing paths

Related categories FinestSupplier related paths
Related applications FinestSupplier related paths
Related solutions FinestSupplier related paths

FinestSupplier related product samples